UK OFFICE / LONDON — MARYLEBONE
ACTIVE PROJECTS ACROSS THE UK & IRELAND
Civil Engineering Contractor · London

Engineering
the ground
beneath
your feet.

Ward & Burke Construction Ltd is a technically led, turnkey design-and-build contractor delivering the water, wastewater, drainage and underground infrastructure that keeps communities running — from first concept through commissioning.

Live Site Ward & Burke construction site showing microtunnelling and heavy civil engineering works underground
SECTOR WATER / WASTEWATER
METHOD MICROTUNNELLING
What we do

Integrated
in-house
capability.

We bring together civil, structural, mechanical, electrical, environmental, process and automation expertise under one roof — so complex infrastructure is designed, built, commissioned and operated by a single, accountable team.

01 / SECTOR

Micro-
tunnelling

Global leaders in trenchless pipeline installation. Wholly owned tunnel boring plant gives us total control over programme, quality and safety.

→
02 / SECTOR

Drainage
& Sewerage

Large-diameter trunk sewers, attenuation networks and pumping stations for water utilities and private developers across the UK.

→
03 / SECTOR

Bridges
& Structures

Design-and-build delivery of highway, rail and pedestrian bridges — from initial feasibility through structural construction and handover.

→
04 / SECTOR

Water
& Wastewater

Treatment works, process tanks and network infrastructure that help communities thrive — clean water in, treated water out.

→
05 / SECTOR

MEICA
Capabilities

Mechanical, electrical, instrumentation, control and automation — delivered in-house for tightly integrated process commissioning.

→
06 / SECTOR

Marine
& Coastal

Outfalls, intakes, quay walls and coastal defence works — engineered to withstand decades of tidal and environmental loading.

→
07 / SECTOR

Plant
Fleet

Extensive wholly owned plant and equipment — TBM's, cranes, piling rigs — giving us flexibility, control and a tighter grip on safety.

→
08 / SECTOR

Design
& Build

Turnkey delivery from outline concept through detailed design, construction, testing and long-term operation. One team, one line of sight.

→
By the numbers

Built on two decades of precision engineering, wholly owned plant, and people who care about getting it right.

2001★
Founded
Turnkey contractor since day one
3x
Continents
Ireland · United Kingdom · North America
2040↘
Net Zero Target
Climate-aligned design & construction
100%
In-House Delivery
Civil · Structural · MEICA · Process
How we deliver

One team.
One line
of sight.

Our success is built on the strength of our people, our collaborative approach with stakeholders, and our ability to develop safe, considered and innovative solutions — supported by extensive, wholly owned plant capabilities that enhance control, flexibility, quality and safety.

  1. Concept & feasibility

    Early contractor involvement brings constructability, programme realism and cost certainty to the table before a single spade hits the ground.

    Phase 01
  2. Design & engineering

    In-house civil, structural, mechanical, electrical, process and automation teams deliver coordinated, buildable designs — no silos, no finger-pointing.

    Phase 02
  3. Construction & commissioning

    Wholly owned plant, directly employed workforce and a single project team take the asset from excavation through to fully commissioned, handover-ready status.

    Phase 03
  4. Operate & maintain

    Long-term operational support — climate risk management, adaptation and mitigation embedded from day one, aligned to a Net Zero Carbon target of 2040.

    Phase 04
Selected work

Delivering vital
infrastructure across
three continents.

From deep urban microtunnelling beneath city streets to long-outfall marine pipelines — every Ward & Burke project is delivered with the same integrated design-and-build discipline. A selection of recent work:

/ 01
Thames Strategic Sewer Network Large-diameter trunk sewer microtunnelling beneath dense urban London
London, UK Microtunnelling →
/ 02
Wastewater Treatment Works Upgrade Full MEICA upgrade and process integration on a live operational site
Ireland Water / MEICA →
/ 03
Urban Highway Bridge Replacement Design-and-build deck replacement over a live rail corridor
United Kingdom Bridges →
/ 04
Georgetown Outfall Pipeline Marine outfall installation using trenchless microtunnelling techniques
Texas, USA Marine →
/ 05
Mississauga Stormwater Attenuation Deep shaft construction and large-diameter TBM drive beneath urban infrastructure
Ontario, Canada Drainage →
/ 06
Cork Harbour Marine Works Quay wall construction and coastal reinforcement on a working port
Cork, Ireland Marine →
Climate commitment

Resilient
infrastructure,
built to last.

Ward & Burke is committed to delivering sustainable and resilient infrastructure — embedding climate considerations from early design right through construction and long-term operation. Our approach is focused on climate-change risk management, with mitigation and adaptation strategies aligned to industry best practice.

Talk to our team
2040

Net Zero Carbon target. Every project we deliver today is engineered against this 2040 horizon — from low-carbon concrete mixes to fully electrified plant on the sites of tomorrow.

Where we work

Local roots.
Global reach.

Headquartered in Galway, Ireland — with a busy UK headquarters in Marylebone, London and operating hubs across North America. Five offices, one shared standard of engineering.

🇮🇪 Ireland

Galway

Global Head Office
Stradbally East
Kilcolgan, Co. Galway
H91 W279
🇮🇪 Ireland

Cork

Regional Office
Railway Road
Charleville, Co. Cork
P56 HE19
🇨🇦 Canada

Mississauga

North America — Tunneling
Ward & Burke Microtunnelling Ltd
Suite #101, 2410 Meadowpine Blvd
Mississauga, ON L5N 6S2
🇺🇸 United States

Georgetown, TX

North America — Tunneling
Ward & Burke Tunneling Inc.
3600 N Interstate 35
Georgetown, Texas 78626
General Enquiries

Talk to us

Five offices · One standard
For sector-specific enquiries, project briefs or careers — reach the office closest to your site, or contact our UK team directly.
Start a conversation

Got a
project in
mind?

Reach the London team directly. Whether it's an early-stage concept, an active tender or a complex MEICA brief — we'll route it to the right engineer.

Visit the office
26 Ivor Pl, London NW1 6HR
Office hours
Mon–Fri · 08:00–17:30 GMT

Request a project review

Tell us a little about the scheme. The right discipline lead will respond.

📞 Call Project enquiry →